dc.contributor.advisor |
Botha, P.J. |
|
dc.contributor.author |
Van Eck, R.J.
|
|
dc.contributor.other |
University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering |
|
dc.date.accessioned |
2012-01-31T11:29:24Z |
|
dc.date.available |
2012-01-31T11:29:24Z |
|
dc.date.created |
2011 |
|
dc.description |
Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2011. |
en_US |
dc.description.abstract |
The evaluation of the post stripping process of the manholes and minimising or eliminating the bottleneck. The improving of production of the half round channel product by looking for alternative methods. |
en_US |
dc.format.extent |
32 pages |
en_US |
dc.format.medium |
PDF |
en_US |
dc.identifier.uri |
http://hdl.handle.net/2263/17970 |
|
dc.language |
en |
|
dc.language.iso |
en |
en_US |
dc.publisher |
University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering |
|
dc.rights |
Copyright: University of Pretoria |
en_US |
dc.subject |
Mini-dissertations (Industrial and Systems Engineering) |
en_US |
dc.subject |
Precast concrete |
en_US |
dc.subject |
Half round channel |
en_US |
dc.subject |
Production flow |
en_US |
dc.subject |
Simulation modelling |
en_US |
dc.subject |
Time study |
en_US |
dc.subject |
Line balancing |
en_US |
dc.title |
A contingency framework of the manufacturing bottleneck of manholes and the improvement of half round channel production |
en_US |
dc.type |
Text |
en_US |