JavaScript is disabled for your browser. Some features of this site may not work without it.
A contingency framework of the manufacturing bottleneck of manholes and the improvement of half round channel production
Van Eck, R.J.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
The evaluation of the post stripping process of the manholes and minimising or eliminating the bottleneck. The improving of production of the half round channel product by looking for alternative methods.
Description:
Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2011.