Improving energy efficiency of cyclone circuits in coal beneficiation plants by pump-storage systems

Show simple item record

dc.contributor.author Zhang, Lijun
dc.contributor.author Xia, Xiaohua
dc.contributor.author Zhang, Jiangfeng
dc.date.accessioned 2014-03-07T10:15:29Z
dc.date.available 2014-03-07T10:15:29Z
dc.date.issued 2014-04
dc.description.abstract A pump storage system (PSS) is introduced to the coal preparation dense medium cyclone (DMC) plants to improve their energy efficiency while maintaining the required medium supply. The DMC processes are very energy intensive and inefficient because the medium supply pumps are constantly over-pumping. The PSS presented is to reduce energy consumption and cost by introducing an addition medium circulation loop. The corresponding pump operation optimization problem in the PSS scheme under timebased electricity tariff is formulated and solved, based on which the financial benefits of the design is investigated using life cycle cost analysis. A case study based on the operation status of a South African coal mine is carried out to verify the effectiveness of the proposed approach. It is demonstrated that the energy cost can be reduced by more than 50% in the studied case by introducing a 160 m3 storage tank. According to life cycle analysis, the PSS Option 1 yields an annual 38% reduction of the overall cost for the beneficiation plant with a payback period of 2.68 years. en
dc.description.librarian hb2014 en
dc.description.librarian ai2014
dc.description.uri http://www.elsevier.com/ locate/apenergy en
dc.identifier.citation Zhang, LJ, Xia, X & Zhang, J 2014, 'Improving energy efficiency of cyclone circuits in coal beneficiation plants by pump-storage systems', Applied Energy, vol. 119, pp. 306-313. en
dc.identifier.issn 0306-2619 (print)
dc.identifier.issn 1872-9118 (online)
dc.identifier.other 10.1016/j.apenergy.2014.01.031
dc.identifier.uri http://hdl.handle.net/2263/37101
dc.language.iso en en
dc.publisher Elsevier en
dc.rights © 2014 Elsevier Ltd. All rights reserved. Notice : this is the author’s version of a work that was accepted for publication in Applied Energy. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Applied Energy, vol.119, pp. 306-313, 2014, doi : 10.1016/j.apenergy.2014.01.031 en
dc.subject Coal beneficiation en
dc.subject Operation optimization en
dc.subject Energy efficiency en
dc.subject Pump storage system (PSS) en
dc.subject Dense medium cyclone (DMC) plants en
dc.subject.lcsh Ore-dressing plants -- South Africa en
dc.subject.lcsh Ore-dressing plants -- Electric equipment -- South Africa en
dc.subject.lcsh Coal mines and mining -- South Africa en
dc.subject.lcsh Mine pumps -- South Africa en
dc.subject.lcsh Coal-mining machinery -- South Africa en
dc.title Improving energy efficiency of cyclone circuits in coal beneficiation plants by pump-storage systems en
dc.type Postprint Article en


Files in this item

This item appears in the following Collection(s)

Show simple item record