Cycle time improvement within the pipe manufacturing process at Rocla (Pty) Ltd

Show simple item record

dc.contributor.author Steyn, Lana
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2010-02-01T07:28:55Z
dc.date.available 2010-02-01T07:28:55Z
dc.date.created 2009-11
dc.date.issued 2010-02-01T07:28:55Z
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2009. en_US
dc.description.abstract Rocla (Pty) Ltd is a manufacturer of precast concrete products situated in Roodepoort, Johannesburg. This document highlights the current problems associated with the manufacturing of pipes resulting in excessive cycle times.In the arrival of a proposed solution, literature was gathered and analysed in order to develop a successful methodology. The methodology employed in solving this problem highlights the use of value stream mapping enhanced by simulation. The proposed solution entails the introduction of a continuous steam chamber, which will alleviate the congestion within the current process, in an attempt of decreasing the cycle time. en_US
dc.description.abstract Rocla (Pty) Ltd vervaardig sementprodukte en is geleë in Roodepoort, Johannesburg. Hierdie dokument beklemtoon die probleme wat huidiglik ervaar word deur Rocla, wat gepaard gaan met onvoldoende prosestye by die vervaardiging van pype. Nadat literatuur bestudeer is, het ‘n voorgestelde metodologie na vore gekom. Die voorgestelde metodologie vir die oplossing van die probleem, beklemtoon die gebruik van waarde-stroomkaarte wat verryk word deur simulasie. Die voorgestelde oplossing fokus op die bekendstelling van ‘n kontinue stoomkamer in die plek van die gewone stoomkamer. Die kontinue stoomkamer sal opondhoud in die produksielyn uitskakel, wat sal lei tot korter prosestye. en_US
dc.identifier.uri http://hdl.handle.net/2263/12801
dc.language en
dc.language.iso en en_US
dc.rights Copyright: University of Pretoria en_US
dc.subject Value stream mapping en_US
dc.subject Simulation en_US
dc.subject Manufacturing en_US
dc.subject.lcsh Precast concrete
dc.subject.lcsh Simulation methods
dc.subject.lcsh Precast concrete industry
dc.title Cycle time improvement within the pipe manufacturing process at Rocla (Pty) Ltd en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record