Developing a mining plan for restarting the operation at Uis mine

dc.contributor.authorMaritz, J.H. (Henko)
dc.contributor.authorUludag, S.
dc.date.accessioned2021-02-02T08:21:45Z
dc.date.available2021-02-02T08:21:45Z
dc.date.issued2019-07
dc.descriptionPaper written on project work carried out in partial fulfilment of B.Eng (Mining Engineering) degree.en_ZA
dc.description.abstractAfriTin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing plant for phase 1 of the Uis tin project, which is scheduled to commence in the last quarter of 2018 . A mining plan is required for phase 1 to supply the new pilot processing plant with 500 kt of run-of-mine ore per annum, for a period of 5 years. New geological mapping and three-dimensional modelling of the mining area were utilized to identify the most optimal mining locations that require low initial waste stripping. An open-pit mining method was selected to target the surface outcrops of the pegmatite orebodies. The mine design criteria were determined and used as input to generate the mine design by utilizing professional engineering software. The mine design was optimized and an overall stripping ratio of 0.81 was achieved. A 5-year production schedule was developed for the mine design according to quarterly periods of three months. A fixed production target of 125 kt of ore was assigned to the quarterly periods, and a ramp-up production target of 65 kt of ore was assigned for the first period. The mobile mining equipment requirements were calculated, and recommendations were made for implementing the 5-year mining plan.en_ZA
dc.description.departmentMining Engineeringen_ZA
dc.description.librarianam2020en_ZA
dc.description.librarianom2025en
dc.description.sdgSDG-01: No povertyen
dc.description.sdgSDG-04: Quality educationen
dc.description.sdgSDG-08: Decent work and economic growthen
dc.description.sdgSDG-09: Industry, innovation and infrastructureen
dc.description.sdgSDG-12: Responsible consumption and productionen
dc.description.sdgSDG-13: Climate actionen
dc.description.sdgSDG-17: Partnerships for the goalsen
dc.description.urihttp://www.saimm.co.za/journal-papersen_ZA
dc.identifier.citationMaritz, J.H. and Uludag, S. 2020, 'Developing a mining plan for restarting the operation at Uis mine', Journal of the Southern African Institute of Mining and Metallurgy, vol. 119, no. 7, pp. 621-630, DOI : 10.17159/2411-717/536/2019.en_ZA
dc.identifier.issn0038-223X (print)
dc.identifier.issn2225-6253 (online)
dc.identifier.other10.17159/2411-717/536/2019
dc.identifier.urihttp://hdl.handle.net/2263/78188
dc.language.isoenen_ZA
dc.publisherSouthern African Institute of Mining and Metallurgyen_ZA
dc.rights© The Southern African Institute of Mining and Metallurgy, 2019en_ZA
dc.subjectMining planen_ZA
dc.subjectMine design criteriaen_ZA
dc.subjectProduction scheduleen_ZA
dc.subjectOptimalen_ZA
dc.subjectStripping ratioen_ZA
dc.subject.otherEngineering, built environment and information technology articles SDG-01
dc.subject.otherSDG-01: No poverty
dc.subject.otherEngineering, built environment and information technology articles SDG-04
dc.subject.otherSDG-04: Quality education
dc.subject.otherEngineering, built environment and information technology articles SDG-08
dc.subject.otherSDG-08: Decent work and economic growth
dc.subject.otherEngineering, built environment and information technology articles SDG-09
dc.subject.otherSDG-09: Industry, innovation and infrastructure
dc.subject.otherEngineering, built environment and information technology articles SDG-12
dc.subject.otherSDG-12: Responsible consumption and production
dc.subject.otherEngineering, built environment and information technology articles SDG-13
dc.subject.otherSDG-13: Climate action
dc.subject.otherEngineering, built environment and information technology articles SDG-17
dc.subject.otherSDG-17: Partnerships for the goals
dc.titleDeveloping a mining plan for restarting the operation at Uis mineen_ZA
dc.typeArticleen_ZA

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Maritz_Developing_2019.pdf
Size:
7.49 MB
Format:
Adobe Portable Document Format
Description:
Article

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.75 KB
Format:
Item-specific license agreed upon to submission
Description: