Developing a mining plan for restarting the operation at Uis mine
Loading...
Date
Authors
Maritz, J.H. (Henko)
Uludag, S.
Journal Title
Journal ISSN
Volume Title
Publisher
Southern African Institute of Mining and Metallurgy
Abstract
AfriTin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing plant
for phase 1 of the Uis tin project, which is scheduled to commence in the last quarter of 2018 . A mining
plan is required for phase 1 to supply the new pilot processing plant with 500 kt of run-of-mine ore per
annum, for a period of 5 years. New geological mapping and three-dimensional modelling of the mining
area were utilized to identify the most optimal mining locations that require low initial waste stripping.
An open-pit mining method was selected to target the surface outcrops of the pegmatite orebodies.
The mine design criteria were determined and used as input to generate the mine design by utilizing
professional engineering software. The mine design was optimized and an overall stripping ratio of 0.81
was achieved. A 5-year production schedule was developed for the mine design according to quarterly
periods of three months. A fixed production target of 125 kt of ore was assigned to the quarterly periods,
and a ramp-up production target of 65 kt of ore was assigned for the first period. The mobile mining
equipment requirements were calculated, and recommendations were made for implementing the 5-year
mining plan.
Description
Paper written on project work carried out in partial fulfilment of B.Eng (Mining Engineering) degree.
Keywords
Mining plan, Mine design criteria, Production schedule, Optimal, Stripping ratio
Sustainable Development Goals
SDG-01: No poverty
SDG-04: Quality education
SDG-08: Decent work and economic growth
SDG-09: Industry, innovation and infrastructure
SDG-12: Responsible consumption and production
SDG-13: Climate action
SDG-17: Partnerships for the goals
SDG-04: Quality education
SDG-08: Decent work and economic growth
SDG-09: Industry, innovation and infrastructure
SDG-12: Responsible consumption and production
SDG-13: Climate action
SDG-17: Partnerships for the goals
Citation
Maritz, J.H. and Uludag, S. 2020, 'Developing a mining plan for
restarting the operation at Uis mine', Journal of the Southern African Institute of Mining and Metallurgy, vol. 119, no. 7, pp. 621-630, DOI : 10.17159/2411-717/536/2019.
