Design and construction risks for a shipping port and container terminal : case study

dc.contributor.authorJoubert, Francois Jacobus
dc.contributor.authorPretorius, Leon
dc.date.accessioned2020-03-26T11:27:03Z
dc.date.available2020-03-26T11:27:03Z
dc.date.issued2020-01
dc.description.abstractThis paper presents the risk identification process, a checklist of 215 different risks, and an associated risk breakdown structure (RBS) for the design and construction phases for a shipping port and associated container terminal. The case study project scope for the research includes a 3,500-m breakwater, 80 ha of reclaimed land, a 1,000-m-long quay wall, port equipment, and buildings. The checklist is categorized according to the project work breakdown structure (WBS) and includes risks associated with (1) breakwater, (2) reclaimed land, (3) entrance canal and basin, (4) quay wall, (5) container yard and buildings, (6) power supply, and (7) project management office. Since the research outcome was developed by subject matter experts during an actual project, it can be used during risk identification, as a completeness check after risk identification on similar projects, or for individual activities (e.g., quay wall construction) per the required project scope. The research also includes a list of risks that specifically relate to marine construction.en_ZA
dc.description.departmentGraduate School of Technology Management (GSTM)en_ZA
dc.description.librarianhj2020en_ZA
dc.description.urihttps://ascelibrary.org/journal/jwped5en_ZA
dc.identifier.citationJoubert, F.J. & Pretorius, L. 2020, 'Design and construction risks for a shipping port and container terminal: case study', Journal of Waterway, Port, Coastal, and Ocean Engineering, vol. 146, no. 1, art. 05019003, pp. 1-13.en_ZA
dc.identifier.issn0733-950X (print)
dc.identifier.issn1943-5460 (online)
dc.identifier.other10.1061/(ASCE)WW.1943-5460.0000537
dc.identifier.urihttp://hdl.handle.net/2263/73838
dc.language.isoenen_ZA
dc.publisherAmerican Society of Civil Engineersen_ZA
dc.rights© ASCE. This work is made available under the terms of the Creative Commons Attribution 4.0 International license, http://creativecommons.org/licenses/by/4.0/.en_ZA
dc.subjectPort constructionen_ZA
dc.subjectContainer terminalen_ZA
dc.subjectProject risk managementen_ZA
dc.subjectRisk identificationen_ZA
dc.subjectChecklisten_ZA
dc.subjectRisk breakdown structure (RBS)en_ZA
dc.subjectWisk breakdown structure (RBS)en_ZA
dc.subjectContainer shippingen_ZA
dc.subjectPorts and harborsen_ZA
dc.subjectBreakwatersen_ZA
dc.subjectCase studiesen_ZA
dc.subjectProject managementen_ZA
dc.subjectWallsen_ZA
dc.subjectConstruction managementen_ZA
dc.titleDesign and construction risks for a shipping port and container terminal : case studyen_ZA
dc.typeArticleen_ZA

Files

Original bundle

Now showing 1 - 2 of 2
Loading...
Thumbnail Image
Name:
Joubert_Design_2020.pdf
Size:
391.21 KB
Format:
Adobe Portable Document Format
Description:
Article
Loading...
Thumbnail Image
Name:
Joubert_DesignSuppl_2020.pdf
Size:
169.6 KB
Format:
Adobe Portable Document Format
Description:
Supplementary Material

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.75 KB
Format:
Item-specific license agreed upon to submission
Description: