A contingency framework of the manufacturing bottleneck of manholes and the improvement of half round channel production
Loading...
Date
Authors
Van Eck, R.J.
Journal Title
Journal ISSN
Volume Title
Publisher
University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
Abstract
The evaluation of the post stripping process of the manholes and minimising or eliminating the bottleneck. The improving of production of the half round channel product by looking for alternative methods.
Description
Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2011.
Keywords
Mini-dissertations (Industrial and Systems Engineering), Precast concrete, Half round channel, Production flow, Simulation modelling, Time study, Line balancing