Design of the TuksBaja Production Facility Assembly Line

Loading...
Thumbnail Image

Date

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

The project documented in this report addressed the need for the design of a vehicle assembly line layout for the TuksBaja organisation. The project centered around the design and project implementation cycle, typically adopted by engineering projects, that began with proposed layouts for the assembly line, utilised economic analysis and simulation modelling to objectively compare the feasible options, and finally analytic hierarchy principles to select the final design for implementation. This report serves to record the entire project life cycle and concluded that the Modular assembly line layout was the best choice for the TuksBaja Production Facility since it not only met the required production demand the fastest, but was also the most economical option.

Description

Mini-dissertation (Final year project) (BEng)--University of Pretoria, 2015.

Keywords

UCTD

Sustainable Development Goals

Citation

*