Design of the TuksBaja Production Facility Assembly Line

dc.contributor.advisorDe Koker, Nicoen
dc.contributor.postgraduateRajh Gopaul, Leshantien
dc.date.accessioned2016-06-02T09:10:11Z
dc.date.available2016-06-02T09:10:11Z
dc.date.created2015en
dc.date.issued2015en
dc.descriptionMini-dissertation (Final year project) (BEng)--University of Pretoria, 2015.en
dc.description.abstractThe project documented in this report addressed the need for the design of a vehicle assembly line layout for the TuksBaja organisation. The project centered around the design and project implementation cycle, typically adopted by engineering projects, that began with proposed layouts for the assembly line, utilised economic analysis and simulation modelling to objectively compare the feasible options, and finally analytic hierarchy principles to select the final design for implementation. This report serves to record the entire project life cycle and concluded that the Modular assembly line layout was the best choice for the TuksBaja Production Facility since it not only met the required production demand the fastest, but was also the most economical option.en
dc.description.availabilityUnrestricteden
dc.description.degreeBEngen
dc.description.departmentIndustrial and Systems Engineeringen
dc.identifier.citation*en
dc.identifier.urihttp://hdl.handle.net/2263/52835
dc.language.isoenen
dc.rights© 2015 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria.en
dc.subjectUCTDen
dc.titleDesign of the TuksBaja Production Facility Assembly Lineen
dc.typeFinal Year Projecten

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
RajhGopaul_Design_2015.pdf
Size:
1.11 MB
Format:
Adobe Portable Document Format
Description:
Final Year Project