Assembly line layout and process optimization at Powertech Transformers

Show simple item record

dc.contributor.author Reyneke, Melani
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2011-05-04T09:56:13Z
dc.date.available 2011-05-04T09:56:13Z
dc.date.created 2010-10
dc.date.issued 2011-05-04T09:56:13Z
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2010. en_US
dc.description.abstract Powertech Transformers, located in Pretoria West, is one of the largest and sophisticated transformer manufacturing plants in the southern hemisphere. The variety of products manufactured is used by local authorities, mines, industrial plants, and the utility industry. The manufacturing plant has experienced problems with the productivity and efficiency of their active assembly area. This project was aimed at optimizing the active assembly line layout and at improving the current process. The selection and implementation of the relevant industrial engineering tools and problem solving techniques helped to achieve this goal. This document describes the situation at Powertech Transformers and how the implementation of systematic layout planning and lean manufacturing will achieve potential savings and improvements. These selected techniques have been directed at improving specifically the material flow and tool usage to ultimately optimize the efficiency and production effectiveness throughout the overall layout area. The future state of Powertech Transformers has a more efficient flow of materials and operations and will ultimately improve the productivity of the area. The improvements will enable the operators and management to have more control over the process and to focus their attention on the quality of the operations and the products. It is expected that with more focus on quality that less products will be faulty, saving time and money. en_US
dc.identifier.uri http://hdl.handle.net/2263/16455
dc.language en
dc.language.iso en en_US
dc.rights Copyright: University of Pretoria en_US
dc.subject Mini-dissertations (Industrial and Systems Engineering) en_US
dc.subject Cost analysis en_US
dc.subject Layout planning en_US
dc.subject Lean manufacturing en_US
dc.title Assembly line layout and process optimization at Powertech Transformers en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record