Breytenbach, WynandVermeulen, GrahamUniversity of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering2013-02-152013-02-152012-10November 2http://hdl.handle.net/2263/21023Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012.The project is a critical analysis and improvement of the throughput rate at Steinmüller Alrode Works. This project aims to increase the turnover in sales for Steinmüller and as a direct result increasing their profits, by focusing on the following critical areas: Flow and stock levels of materials. Standardising materials. Workforce motivation and empowerment. Workforce performance management. Communication between management and workers and between shifts. Improve throughput by optimizing the level of quality in relation to the standard time The optimal number of workers per bellow.81 pagesPDFenCopyright: University of PretoriaMini-dissertations (Industrial and Systems Engineering)ProductivityStandardizing materialsWorkforce performance managementProcess optimizationA critical analysis of the throughput rate at Steinmüller Alrode WorksText