Taghizadeh, SedighehZhang, LijunXia, Xiaohua2018-01-262017-12Taghizadeh, S., Zhang, L. & Xia, X. 2017, 'Scheduling of a grid-tied photovoltaic system considering HESS and PHEV', IFAC-PapersOnLine, vol. 50, no. 2, pp. 239-240.1474-667010.1016/j.ifacol.2017.12.047http://hdl.handle.net/2263/63745In this paper an optimal scheduling strategy is presented for an MG installed with a BSHS. This problem has not been studied in the current literature. The goal is to increase the revenue of the MG and to maximize the lifespan of the battery bank taking advantage of the supercapacitor.en© 2017 IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved. Notice : this is the author’s version of a work that was accepted for publication in IFAC papers online. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. A definitive version was subsequently published in IFAC papers online, vol. 50, no. 2, pp. 239-240, 2017. doi : 10.1016/j.ifacol.2017.12.047.SupercapacitorOptimal scheduling strategyGrid-connected microgrids (MG)Battery bankLifespanDistributed generation (DG)Energy storage systems (ESS)Battery supercapacitor hybrid storage (BSHS)Scheduling of a grid-tied photovoltaic system considering HESS and PHEVPostprint Article