Optimizing the S.S.A. Ratio level indexes of the PBS process in Nissan’s production plant

dc.contributor.authorVan der Merwe, Schalk-Joseph
dc.contributor.emailjozine.botha@up.ac.zaen_US
dc.contributor.otherUniversity of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned2011-05-04T10:01:31Z
dc.date.available2011-05-04T10:01:31Z
dc.date.created2010-10
dc.date.issued2011-05-04T10:01:31Z
dc.descriptionThesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2010.en_US
dc.description.abstractThe aim of this paper is to review the significance of Scheduling and Sequencing, this have an effect on the Scheduled Sequence Achievement Ratio (S.S.A.R.) rating in the Painted Body Storage (PBS) facility in Nissan’s production plant situated in Rosslyn. Nissan uses the S.S.A.R. rating to measure how the cars keep their scheduled sequence throughout the manufacturing process. This paper reviews methods for solving car sequencing problems, the first methods consists of Variable Neighbourhood Search, the second method of Ant Colony Optimization and the last method uses Greedy Heuristics. These methods are evaluated in terms of the problem we have at the PBS. A Heuristic is developed as a conceptual solution to address the sequencing problem at the PBS Facility. The objective of the Heuristic is to search for the minimum difference in Douki Seisan Number between the vehicles that is last in each lane 1 J and the vehicle that needs to be committed into the lanes. This Heuristic is implemented at the decision nodes in the PBS Facility. Results suggest the Heuristic have a greater impact on achieving better S.S.A.R. Ratings at the decision nodes than the current way of decision making that is based on the type of model.en_US
dc.identifier.urihttp://hdl.handle.net/2263/16458
dc.languageen
dc.language.isoenen_US
dc.rightsCopyright: University of Pretoriaen_US
dc.subjectMini-dissertations (Industrial and Systems Engineering)en_US
dc.subjectScheduled Sequence Achievement Ratioen_US
dc.subjectManufacturing processen_US
dc.titleOptimizing the S.S.A. Ratio level indexes of the PBS process in Nissan’s production planten_US
dc.typeTexten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Van der Merwe_Optimizing(2010).pdf
Size:
9.09 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.44 KB
Format:
Item-specific license agreed upon to submission
Description: