Scheduling of a grid-tied photovoltaic system considering HESS and PHEV
Loading...
Date
Authors
Taghizadeh, Sedigheh
Zhang, Lijun
Xia, Xiaohua
Journal Title
Journal ISSN
Volume Title
Publisher
Elsevier
Abstract
In this paper an optimal scheduling strategy is presented for an MG installed with a BSHS. This problem has not been studied in the current literature. The goal is to increase the revenue of the MG and to maximize the lifespan of the battery bank taking advantage of the supercapacitor.
Description
Keywords
Supercapacitor, Optimal scheduling strategy, Grid-connected microgrids (MG), Battery bank, Lifespan, Distributed generation (DG), Energy storage systems (ESS), Battery supercapacitor hybrid storage (BSHS)
Sustainable Development Goals
Citation
Taghizadeh, S., Zhang, L. & Xia, X. 2017, 'Scheduling of a grid-tied photovoltaic system considering HESS and PHEV', IFAC-PapersOnLine, vol. 50, no. 2, pp. 239-240.