The influence of statistical aggregation measures and intervals for processing automated rut depth measurements on Pavement Management Systems

dc.contributor.advisorSteyn, Wynand JvdM
dc.contributor.coadvisorDu Plooy, Raelize
dc.contributor.emailtina.papadouris@gmail.comen_ZA
dc.contributor.postgraduatePapadouris, Christina
dc.date.accessioned2022-02-28T08:49:34Z
dc.date.available2022-02-28T08:49:34Z
dc.date.created2022
dc.date.issued2021
dc.descriptionDissertation (MEng (Transportation Engineering))--University of Pretoria, 2021.en_ZA
dc.description.abstractAutomated rutting data is condensed by means of statistical measures, mostly averages, over larger intervals to characterise pavement sections, thereby reducing the amount of data required to be analysed. Longer pavement sections, however, do not necessarily represent homogeneous performance conditions, and valuable information is lost as a result of the aggregation process. Using this aggregated data as an input in pavement management systems (PMS) may result in inaccurate condition prediction, maintenance requirements, and budgetary forecasts. The level of aggregation, including the selected analysis pavement section lengths, influences the extent to which this information is inaccurately forecast. This study investigates the potential effects, as influenced by varying aggregated section lengths, of using statistical aggregation measures, namely, averages and percentiles, to analyse high-density automated rutting data, on the distribution of rut depth over a pavement section, and the respective maintenance, funding, and pavement performance requirements. When using the mean as the statistical aggregation measure, the study indicated that the dispersion of rut depth reduces with increasing averaged section length, resulting in inaccurate condition and maintenance requirement forecasts. Introducing percentiles as the aggregation measure revealed that percentiles offer more accuracy over averages. For annual financial planning, the 50th percentile is most suitable. For technical needs planning, the 75th percentile is better suited, considering higher percentiles (90th to 99th) where high priority roads and performance requirements are a concern.en_ZA
dc.description.availabilityUnrestricteden_ZA
dc.description.degreeMEng (Transportation Engineering)en_ZA
dc.description.departmentCivil Engineeringen_ZA
dc.identifier.citation*en_ZA
dc.identifier.otherA2022en_ZA
dc.identifier.urihttp://hdl.handle.net/2263/84258
dc.language.isoenen_ZA
dc.publisherUniversity of Pretoria
dc.rights© 2022 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
dc.subjectPavement managementen_ZA
dc.subjectStatistical aggregationen_ZA
dc.subjectRut depthen_ZA
dc.subjectMaintenance predictionen_ZA
dc.subjectRut distributionen_ZA
dc.subjectUCTD
dc.titleThe influence of statistical aggregation measures and intervals for processing automated rut depth measurements on Pavement Management Systemsen_ZA
dc.typeDissertationen_ZA

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Papadouris_Influence_2021.pdf
Size:
12.89 MB
Format:
Adobe Portable Document Format
Description:
Dissertation

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.75 KB
Format:
Item-specific license agreed upon to submission
Description: