The simulation of a manganese railway siding facility

dc.contributor.authorLubbe, Ettienne Marius
dc.contributor.emailjozine.botha@up.ac.zaen_US
dc.contributor.otherUniversity of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned2011-05-11T09:21:09Z
dc.date.available2011-05-11T09:21:09Z
dc.date.created2010-10
dc.date.issued2011-05-11T09:21:09Z
dc.descriptionThesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2010.en_US
dc.description.abstractITE consulting takes pride in providing a proposal to evaluate and confirm the design parameters and operational philosophy of the rail siding operations near the manganese mines at Lohatla. The client, a logistics company, has been contracted by a mining company to assist with the export of Manganese ore from various mines in the Lohatla region. The client will be provided with one train from Transnet Freight Rail daily and their contractual arrangement is to have a turnaround time of not more than 12 hours. They need confirmation that their proposed layout will achieve this objective. Because the data supplied by the customer didn’t include any variation, different sets of data were used in the simulation. The first set excluded any variation, whilst the second set of inputs included added randomness. This ensures that the simulation is a better representation of the real world where variation is common. Outputs from both sets of inputs were analysed and compared before recommendations were made. Whilst simulating the Manganese Railway Siding Facility, a bottle neck was identified at the weighbridge. This bottleneck made it impossible to achieve a train turnaround time of less than 12 hours. After analysing all results obtained from the simulation done in Arena, it is recommended that the weigh time at the weighbridge be decreased to 5 minutes or less, or a second weighbridge be installed. Either of the proposed solutions would enable the system to produce a train turnaround time of less than 12 hours.en_US
dc.identifier.urihttp://hdl.handle.net/2263/16548
dc.languageen
dc.language.isoenen_US
dc.rightsCopyright: University of Pretoriaen_US
dc.subjectInput dataen_US
dc.subjectArena softwareen_US
dc.subjectLogisticsen_US
dc.subjectTransnet Freight Railen_US
dc.titleThe simulation of a manganese railway siding facilityen_US
dc.typeTexten_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Lubbe_Simulation(2010).pdf
Size:
683.44 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.44 KB
Format:
Item-specific license agreed upon to submission
Description: