The recovery of passenger train services on the central line,Western Cape,following an unprecedented level of theft and vandalism of infrastructure and stations

dc.contributor.authorMarautla, F.
dc.contributor.authorMaseko ,R.
dc.date.accessioned2024-11-22T09:34:49Z
dc.date.available2024-11-22T09:34:49Z
dc.date.issued2024
dc.descriptionPapers presented virtually at the 42nd International Southern African Transport Conference on 08 - 11 July 2024
dc.description.abstractThe passenger rail service came to a halt in Nov 2019 on the Central Line in the Western Cape following a rampant theft and vandalism of infrastructure and stations at a scale never seen before in South Africa. The suspension of the train services on this corridor has had a severe impact on the business of PRASA to support commuters that depend on the train service as a means of transportation and the company’s ability to collect revenue. The proliferation of the construction mafia culture and gangsterism has not helped matters in this part of the country. During the hard covid-19 lockdown period in 2020 informal dwellers occupied the line between Nyanga - Philippi, making the resumption of the train service even more difficult as the dwellings needed to be removed first before the recovery work can resume. PRASA decided to introduce a Service Recovery Programme specifically aimed at fixing the infrastructure along this corridor with rehabilitation of the power supply network forming an integral part of that programme. By early June 2024 a portion of the line was ready to resume the train service following the rebuilding of the line.
dc.format.extent1 page
dc.format.mediumPDF
dc.identifier.urihttp://hdl.handle.net/2263/99313
dc.language.isoen
dc.publisherSouthern African Transport Conference
dc.rightsSouthern African Transport Conference 2024
dc.subjectPassenger rail service
dc.subjectCentral Line in the Western Cape
dc.subjectTheft and vandalism of infrastructure and stations
dc.titleThe recovery of passenger train services on the central line,Western Cape,following an unprecedented level of theft and vandalism of infrastructure and stations
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1E_06.pdf
Size:
113.01 KB
Format:
Adobe Portable Document Format