A changeover reduction project on line 7 SAB-Alrode
dc.contributor.advisor | Breytenbach, Wynand | |
dc.contributor.author | Groenewald, Etrecia | |
dc.contributor.other | University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering | |
dc.date.accessioned | 2013-02-15T10:14:42Z | |
dc.date.available | 2013-02-15T10:14:42Z | |
dc.date.created | 2012-10 | |
dc.description | Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012. | en_US |
dc.description.abstract | SAB Alrode sets various operational targets, amongst others; changeover time. Currently, Brand Pack changeover time on Line7 is inconsistent and needs to be reduced to an absolute minimum in order to ensure maximum production and profitability. A Data Analysis is conducted in order to understand the process and redefine the problem statement. Thereafter, a Literature study is conducted to identify possible tools in reducing the changeover inconsistency. Tools such as Process Maps, Cause & Effect diagrams and a Failure Mode and Effect Analysis will be completed following the DMAIC structure. Relevant improvements are recommended, verified and a conclusion is reached. | en_US |
dc.format.extent | 71 pages | en_US |
dc.format.medium | en_US | |
dc.identifier.uri | http://hdl.handle.net/2263/21038 | |
dc.language.iso | en | en_US |
dc.publisher | University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering | |
dc.rights | Copyright: University of Pretoria | en_US |
dc.subject | Mini-dissertations (Industrial and Systems Engineering) | en_US |
dc.subject | Changeover reduction | en_US |
dc.subject | Lean manufacturing | en_US |
dc.subject | Six sigma | en_US |
dc.subject | Statistical process measures | en_US |
dc.subject | Process maps | en_US |
dc.title | A changeover reduction project on line 7 SAB-Alrode | en_US |
dc.type | Text | en_US |