High pressure feedwater heaters replacement optimisation

dc.contributor.advisorCoetzee, Jasper L.en
dc.contributor.emailu15397034@tuks.co.zaen
dc.contributor.postgraduatePieterse, Casperen
dc.date.accessioned2017-07-13T13:28:57Z
dc.date.available2017-07-13T13:28:57Z
dc.date.created2017-04-26en
dc.date.issued2016en
dc.descriptionDissertation (MEng)--University of Pretoria, 2016.en
dc.description.abstractWidespread uncertainty exists regarding the ideal replacement time of installed feedwater heaters in coal fired power plants. Eskom consequently identified the need for this research project to find the optimal age at which to replace high pressure (HP) feedwater heaters. Previous work has failed to quantify the unique financial risk of tube failures, which varies for individual heaters. Using life cycle cost (LCC) methodology, a framework is developed for the optimisation of the HP feedwater heater replacement age in Eskom coal fired power plants and integrated into existing software used in the organization. This entails identifying the most significant cost factors involved in the lifecycle of HP heaters and determining how they evolve over time by conducting a case study. Minimum life cycle cost for an actual HP heater is calculated in the case study based on failure data and cost information supplied by the power plant. This optimisation of replacement time can realise significant savings in annualised LCC compared to current practice.en_ZA
dc.description.availabilityUnrestricteden
dc.description.degreeMEngen
dc.description.departmentMechanical and Aeronautical Engineeringen
dc.description.librarianmi2025en
dc.description.sdgSDG-07: Affordable and clean energyen
dc.description.sdgSDG-09: Industry, innovation and infrastructureen
dc.description.sdgSDG-12: Responsible consumption and productionen
dc.identifier.citationPieterse, C 2016, High pressure feedwater heaters replacement optimisation, MEng Dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/61325>en
dc.identifier.otherA2017en
dc.identifier.urihttp://hdl.handle.net/2263/61325
dc.language.isoenen
dc.publisherUniversity of Pretoriaen
dc.rights© 2017 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.en
dc.subjectUCTDen
dc.subjectFeedwater heaters
dc.subjectHigh pressure systems
dc.subjectReplacement optimisation
dc.subject.otherEngineering, built environment and information technology theses SDG-07
dc.subject.otherSDG-07: Affordable and clean energy
dc.subject.otherEngineering, built environment and information technology theses SDG-09
dc.subject.otherSDG-09: Industry, innovation and infrastructure
dc.subject.otherEngineering, built environment and information technology theses SDG-12
dc.subject.otherSDG-12: Responsible consumption and production
dc.titleHigh pressure feedwater heaters replacement optimisationen_ZA
dc.typeDissertationen

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Pieterse_High_2016.pdf
Size:
3.8 MB
Format:
Adobe Portable Document Format
Description:
Dissertation