Noise and vibration assessment of the Gautrain Rapid Rail Link

dc.contributor.authorCosijn, Derek
dc.contributor.authorVan Niekerk, Wikus
dc.contributor.authorMorgan, John
dc.contributor.otherSouthern African Transport Conference (22nd : 2003 : Pretoria, South Africa)
dc.date.accessioned2008-08-14T12:43:37Z
dc.date.available2008-08-14T12:43:37Z
dc.date.issued2003-07
dc.descriptionThis paper was transferred from the original CD ROM created for this conference. The material on the CD ROM was published using Adobe Acrobat technology. The original CD ROM was produced by Document Transformation Technologies Postal Address: PO Box 560 Irene 0062 South Africa. Tel.: +27 12 667 2074 Fax: +27 12 667 2766 E-mail: doctech@doctech.co.za URL: http://www.doctech.co.zaen
dc.description.abstractPaper presented at the 22nd Annual Southern African Transport Conference 14 - 16 July 2003 "National issues affecting the movement of people and goods - strategic approaches", CSIR International Convention Centre, Pretoria, South Africa. ABSTRACT: The Gautrain Rapid Rail Link is a new high speed railway commuter (transit) system planned along two linked corridors in central Gauteng, namely between Johannesburg and Pretoria, and between Sandton and Johannesburg International Airport. The introduction of this rail system has the potential for noise and vibration impact if the railway system is not designed carefully and if appropriate mitigating measures are not taken where required. As part of the environmental impact assessment (EIA) of the project, a comprehensive investigation of the potential noise and ground-borne vibration impact from the train was undertaken. There are no existing South African noise and vibration standards related to railways and their operation, and thus such criteria needed to be established specifically for this project. International standards were considered to be applicable as the basis for the recommendations for the Gautrain project. There are also no existing "official" South African noise and vibration prediction models and appropriate calculation methods had to be sourced from international best practice. Although the implementation of the Gautrain project has the potential for significant noise and vibration impact if appropriate mitigating measures are not taken where required, the nature and level of the impact is such that appropriate mitigating measures are possible.en
dc.format.extent253425 bytes
dc.format.mimetypeapplication/pdf
dc.identifier.citationCosijn, D, Van Niekerk, W & Morgan, J 2003, 'Noise and vibration assessment of the Gautrain Rapid Rail Link', Paper presented to the 22nd Annual Southern African Transport Conference, South Africa, 14 - 16 July.en
dc.identifier.isbn0958460965
dc.identifier.urihttp://hdl.handle.net/2263/6584
dc.languageeng
dc.language.isoenen
dc.publisherSATCen
dc.relation.ispartofSATC 2003
dc.rightsUniversity of Pretoriaen
dc.subjectGautrainen
dc.subjectRapid rail linken
dc.subjectVibration impacten
dc.subjectEnvironmental impact assessment (EIA)en
dc.subject.lcshTransportation -- South Africa -- Congressesen
dc.subject.lcshTransportation -- Environmental aspects -- South Africaen
dc.subject.lcshHigh speed trains -- Environmental aspects -- South Africaen
dc.subject.lcshGautrain Projecten
dc.subject.lcshHigh speed trains -- Vibration -- South Africa -- Congressesen
dc.titleNoise and vibration assessment of the Gautrain Rapid Rail Linken
dc.typePresentationen

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Cosijn_Noise(2003).pdf
Size:
247.49 KB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
2.39 KB
Format:
Item-specific license agreed upon to submission
Description: