dc.description Mini Dissertation (MA (Environment and Society))--University of Pretoria, 2022. en_ZA
dc.description.abstract This study focuses on the Kendal Power Station located in the Nkangala District, eMalahleni Municipality in Mpumalanga Province, South Africa. The study intended to establish whether or not the effluent water management activities impact negatively on the ground water resources surrounding the power station. This was done by examining the monitoring reports on the boreholes used for monitoring potential contamination of groundwater caused by effluent water, and whether this complies with the limits as stipulated in the power station water use licence. Data from 2011 to 2020 was used. The chemical variables which formed part of the study are pH, electrical conductivity, sodium, calcium, and sulphates. Four boreholes in the vicinity of the effluent water dams were used for this study. In instances where the limits as stipulated in the water use license were exceeded, it indicated that pollution or contamination of the groundwater resources occurred. It was found that three boreholes had high instances of non-compliance with the water use license limits. The fourth borehole, which is located at the highest topographic point, had less instances of non-compliances to the water use license limits, compared to the two boreholes in close proximity. It was also found that the highest incidences of non-compliance were with sodium, followed by sulphates, electrical conductivity, and calcium, with pH having the least incidences of non-compliances. It was thus concluded that the Kendal Power Station did not implement pollution prevention principles in effluent water management. en_ZA
dc.description.availability Unrestricted en_ZA
dc.description.degree MA (Environment and Society) en_ZA
dc.description.department Geography, Geoinformatics and Meteorology en_ZA
dc.identifier.citation * en_ZA
dc.identifier.other S2022 en_ZA
dc.identifier.uri http://hdl.handle.net/2263/83641
dc.language.iso en en_ZA
dc.publisher University of Pretoria
dc.rights © 2022 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria.
dc.subject UCTD en_ZA
dc.subject Env812 en_ZA
dc.subject Pollution prevention en_ZA
dc.subject Effluent water management en_ZA
dc.subject Kendal Power Station en_ZA
dc.subject Compliance en_ZA
dc.title The importance of implementing pollution prevention principle in effluent water management for environmental legal compliance in a coal power station, a case of Kendal Power Station, Mpumalanga Province, South Africa en_ZA