Splitting procedures for the mixed capacitated arc routing problem under time restrictions with intermediate facilities

Show simple item record

dc.contributor.author Willemse, Elias J.
dc.contributor.author Joubert, Johannes Willem
dc.date.accessioned 2016-08-18T05:18:15Z
dc.date.issued 2016-09
dc.description.abstract This paper develops optimal and quick near-optimal splitting procedures for the Mixed Capacitated Arc Routing Problem under Time restrictions with Intermediate Facilities. Splitting procedures are a key component of giant tour-based solution methods for Arc Routing Problems. The optimal and near-optimal splitting procedures are tested within a multi-start constructive heuristic, and a fixed execution-time limit is imposed. Results on benchmark instances show that the constructive-heuristic linked with the new optimal splitting algorithm performs better than the near-optimal versions. en_ZA
dc.description.department Industrial and Systems Engineering en_ZA
dc.description.embargo 2017-09-30
dc.description.librarian hb2016 en_ZA
dc.description.sponsorship The National Research Foundation of South Africa (Grant Number 87749) and by the South African Department of Trade and Industry (Grant Number 96415). en_ZA
dc.description.uri http://www.elsevier.com/locate/orl en_ZA
dc.identifier.citation Willemse, EJ & Joubert, JW 2016, 'Splitting procedures for the mixed capacitated arc routing problem under time restrictions with intermediate facilities', Operations Research Letters, vol. 44, no. 5, pp. 569-574. en_ZA
dc.identifier.issn 0167-6377
dc.identifier.other 10.1016/j.orl.2016.06.001
dc.identifier.uri http://hdl.handle.net/2263/56379
dc.language.iso en en_ZA
dc.publisher Elsevier en_ZA
dc.rights © 2016 Elsevier B.V. All rights reserved. Notice : this is the author’s version of a work that was accepted for publication in Operations Research Letters. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Operations Research Letters, vol. 44, no. 5, pp. 569-574, 2016. doi : 10.1016/j.orl.2016.06.001. en_ZA
dc.subject Waste collection en_ZA
dc.subject Intermediate facilities en_ZA
dc.subject Mixed network en_ZA
dc.subject Splitting procedures en_ZA
dc.subject Capacitated arc routing problem (CARP) en_ZA
dc.subject Capacitated arc routing problem under time restrictions with intermediate facilities (CARPTIF) en_ZA
dc.title Splitting procedures for the mixed capacitated arc routing problem under time restrictions with intermediate facilities en_ZA
dc.type Postprint Article en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record