Electricity generation as a beneficial post-closure land use option for a dormant tailings storage facility

Show simple item record

dc.contributor.author Van Eeden, S.J.
dc.contributor.author Jacobsz, Schalk Willem
dc.contributor.author Rust, M.
dc.contributor.author Rust, Eben
dc.date.accessioned 2016-06-06T11:17:42Z
dc.date.available 2016-06-06T11:17:42Z
dc.date.issued 2016-03
dc.description.abstract Dormant tailings storage facilities (TSFs) have negative effects on their surrounding environments and communities. This study is aimed at determining the financial and practical feasibility of generating energy from the ERGO TSF site, near Brakpan, Johannesburg, as a beneficial post-closure land use option. The beneficial post-closure options investigated were rainwater harvesting and electricity generation from wind power, photo voltaic solar power and a pump storage system constructed on the TSF. Wind power generation and rainwater harvesting from the site were found to be unviable. It was found that a 470 MW (peak capacity) solar photo voltaic plant on top of the ERGO TSF will provide the best solution, both from a practical and financial point of view, yielding a potential internal rate of return (IRR) of 10.7% over 50 years. A pump storage system yields a maximum IRR of 10.3%, but with a substantially smaller generation capacity of approximately 80 MW. en_ZA
dc.description.department Civil Engineering en_ZA
dc.description.librarian am2016 en_ZA
dc.description.sponsorship The Green Fund en_ZA
dc.description.uri http://www.journals.co.za/ej/ejour_civileng.html en_ZA
dc.identifier.citation Van Eeden SJ, Jacobsz SW, Rust M, Rust E. Electricity generation as a beneficial post-closure land use option for a dormant tailings storage 53 facility. J. S. Afr. Inst. Civ. Eng. 2016;58(1), Art. #1223, 9 pages. http://dx.DOI.org/ 10.17159/2309-8775/2016/v58n1a6. en_ZA
dc.identifier.issn 1021-2019
dc.identifier.other 10.17159/2309-8775/2016/v58n1a6
dc.identifier.uri http://hdl.handle.net/2263/52886
dc.language.iso en en_ZA
dc.publisher South African Institution of Civil Engineering en_ZA
dc.rights South African Institution of Civil Engineering en_ZA
dc.subject Electricity generation en_ZA
dc.subject Solar photo voltaic system en_ZA
dc.subject Pump storage system en_ZA
dc.subject Tailings storage facilities en_ZA
dc.subject Mine closure en_ZA
dc.subject Dormant tailings storage facilities (TSFs) en_ZA
dc.subject.other Engineering, built environment and information technology articles SDG-07
dc.subject.other SDG-07: Affordable and clean energy
dc.subject.other Engineering, built environment and information technology articles SDG-09
dc.subject.other SDG-09: Industry, innovation and infrastructure
dc.subject.other Engineering, built environment and information technology articles SDG-11
dc.subject.other SDG-11: Sustainable cities and communities
dc.subject.other Engineering, built environment and information technology articles SDG-13
dc.subject.other SDG-13: Climate action
dc.title Electricity generation as a beneficial post-closure land use option for a dormant tailings storage facility en_ZA
dc.type Article en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record