  • Knobbs, Clive G.; Gerryts, Erna W.; Kagogo, T.; Neser, M. (Southern African Institute of Mining and Metallurgy, 2014-12)
    Contrary to the way it is often portrayed, the average organization or company is far from being a cold, calculating machine. It is actually a highly emotive place where interaction with people is a fundamental part of ...
  • Napier, J.A.L. (John); Malan, D.F. (Daniel Francois) (Elsevier, 2018-09)
    This paper describes a method to determine the time-dependent stability of the fracture zone near the edges of tabular excavation layouts when different mining rates and face advance increment lengths are scheduled. Some ...
  • Napier, J.A.L. (John); Malan, D.F. (Daniel Francois) (Southern African Institute of Mining and Metallurgy, 2012-08)
    It has been established that significant time-dependent stope convergence may occur over time periods of hours and days in certain hard-rock gold and platinum mines. The source of this time-dependent behaviour appears ...
  • Esterhuyse, J.C.; Malan, D.F. (Daniel Francois) (Southern African Institute of Mining and Metallurgy, 2018-12)
    Mining in the Carletonville area of the Witwatersrand Basin predates 1934. Owing to the depletion of higher grade ore, the current activities focus increasingly on the extraction of lower grade secondary reefs as well as ...
  • Qu, Qingdong; Balusu, Rao; Belle, Bharath K. (Elsevier, 2022-09)
    Longwall coal mines in the Bowen Basin of Australia are highly productive and gassy, comprising many coal seams above the working seam. Predictive modelling of specific gas emission (SGE) using the conventional Winter model ...
  • Grobler, Hennie; Maritz, J.A. (Jan) (Southern African Institute of Mining and Metallurgy, 2017-08)
    The Chamber of Mines of South Africa (CoMSA) Certificates of Competency (CoCs) were introduced to standardize stand-alone in-house qualifications for persons working in the South African Mining and Minerals Industries ...
  • Alejano, L.R.; Arzua, J.; Castro-Filgueira, U.; Malan, D.F. (Daniel Francois) (Southern African Institute of Mining and Metallurgy, 2017-06)
    Pillar design for underground mining is typically done using empirical formulae or numerical modelling. Practical experience and recent literature, nevertheless, illustrate the shortcomings of these design approaches. ...
  • Kleyn, G.; Du Plessis, J.J.L. (Southern African Institute of Mining and Metallurgy, 2016-04)
    Sub-standard practices and their adverse impact on safety performance remain a challenge in the South African gold mining industry. The purpose of this study was to investigate the root causes of sub-standard practices and ...
  • Viljoen, A.; Du Plessis, J.J.L. (Mine Ventilation Society of South Africa, 2019-01)
    The use of high powered catalogued auxiliary fans to meet the ventilation requirements of fairly shallow mines is common practice and often is not an energy efficient ventilation solution. This paper describes the ...
  • Jacobs, Jonatan; Webber-Youngman, R.C.W. (Southern African Institute of Mining and Metallurgy, 2017-07)
    It is vital for organizations and individual operations to have access to a platform with technology-related information to consider for further research and development. This paper presents a technology map that ...
  • Du Plessis, J.J.L.; Van Dijk, R.L.S. (Southern African Institute of Mining and Metallurgy, 2001-10)
    The French research institute, INERIS, requested the assistance of the CSIR’s Division of Mining Technology in developing further precautionary measures against explosions in their collieries. In response to this approach, ...
  • Boshoff, D.; Webber-Youngman, R.C.W. (Southern African Institute of Mining and Metallurgy, 2011-12)
    The ability of an explosive to break rock is influenced considerably by the extent of confinement in the blasthole. It is believed that confinement is improved by the use of adequate stemming. The aim of this paper is to ...
  • Mulder, Hardus; Bekker, M.C. (Michiel Christiaan) (Southern African Institute of Mining and Metallurgy, 2022-09)
    The principal objective of this investigation was to conduct a thorough literature review on the status of project readiness mechanisms, tools, techniques, and frameworks for mining projects. The review aimed at identifying ...
  • Ferreira, S.J.S. (Southern African Institute of Mining and Metallurgy, 2012-04)
    Anglo American Platinum’s Khomanani 2 shaft changed over from down-dip mining to breast mining in 2004. The changeover was made to ensure that production targets were met, as it was said that predevelopment for down-dip ...
  • Osae, W.K.; Fauconnier, C.J.; Webber-Youngman, R.C.W. (Southern African Institute of Mining and Metallurgy, 2011-12)
    A value assessment model which uses deal objectives, financial and non-financial indicators as a guide to assess value creation in mergers and acquisitions. The extent to which post- merger deal objectives are achieved ...