Optimal power dispatch of a grid tied-battery-photovoltaic system supplying heat pump water heaters

Show simple item record

dc.contributor.author Sichilalu, Sam M.
dc.contributor.author Xia, Xiaohua
dc.date.accessioned 2015-07-13T07:19:23Z
dc.date.available 2015-07-13T07:19:23Z
dc.date.issued 2015-09
dc.description.abstract The aim of this paper is to develop an optimal scheduling strategy model for a grid-tied photovoltaic (PV) system to power a heat pump water heater (HPWH). The system is composed of PV modules that are grid-tied and a backup battery. The PV is capable of supplying power simultaneously to the HPWH and domestic load, whilst the grid and the battery are complementary sources. The objective function of this model is energy cost. The time-of-use (TOU) electricity tari is taken into account in the optimal scheduling model. The control variables are the power flows within the branches of the system. The optimal control strategy of this grid-tied PV system can be implemented to reduce the energy cost while meeting the technical and operational constraints. This model has shown to have more economic benefits than solar thermal heaters, because of the possibility to turn the dwelling into net-zero energy or energy-positive buildings with the attractiveness of the feed-in tari . A case study is done based on 3x16 kW HPWH installed at a Pretoria hotel in South Africa. Simulations are run for a year on selected seasonal date using the actual HPWH demand. The optimal control results show how the battery status of charge and TOU a ect the power scheduling strategy of the HPWH. The energy and cost savings are presented in this paper as well. en_ZA
dc.description.embargo 2016-09-15 en_ZA
dc.description.librarian hb2015 en_ZA
dc.description.uri http://www.elsevier.com/locate/enconman en_ZA
dc.identifier.citation Sichilalu, SM & Xia, X 2015, 'Optimal power dispatch of a grid tied-battery-photovoltaic system supplying heat pump water heaters', Energy Conversion and Management, vol. 102, pp. 81-91. en_ZA
dc.identifier.issn 0196-8904 (print)
dc.identifier.issn 1879-2227 (online)
dc.identifier.other 10.1016/j.enconman.2015.03.087
dc.identifier.uri http://hdl.handle.net/2263/47987
dc.language.iso en en_ZA
dc.publisher Elsevier en_ZA
dc.rights © 2015 Elsevier. All rights reserved. Notice : this is the author’s version of a work that was accepted for publication in Energy Conversion and Management. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Energy Conversion and Management, vol. 102, pp.81-91, 2015. doi : 10.1016/j.enconman.2015.03.087 en_ZA
dc.subject Optimal scheduling en_ZA
dc.subject Net-zero energy buildings en_ZA
dc.subject Time-of-use tariff en_ZA
dc.subject Photovoltaic (PV) en_ZA
dc.subject Time-of-use (TOU) en_ZA
dc.subject Heat pump water heater (HPWH) en_ZA
dc.title Optimal power dispatch of a grid tied-battery-photovoltaic system supplying heat pump water heaters en_ZA
dc.type Postprint Article en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record