Design and implementation of a turbo roundabout

Loading...
Thumbnail Image

Date

Authors

Kendal, G R
Reutener, I

Journal Title

Journal ISSN

Volume Title

Publisher

Abstract

Paper presented at the 33rd Annual Southern African Transport Conference 7-10 July 2014 "Leading Transport into the Future", CSIR International Convention Centre, Pretoria, South Africa.
A first for South Africa, the KwaZulu-Natal Department of Transport (DoT) has partnered with the South African National Roads Agency (SANRAL SOC LTD) to upgrade the R102 / P535 / P743 intersection( west of the eSikhawini off-ramp off the N2 between Mtunzini and Empangeni) into a Turbo Roundabout traffic circle. Royal HaskoningDHV was appointed for the design of the turbo roundabout. The benefits include:  improved driver safety  reduced delays and congestion at the intersection; and  improved pedestrian safety and crossing opportunities When compared with a normal traffic circle, the crossing over of lanes when exiting the circle has now been eliminated with the design of the Turbo Roundabout, resulting in less side swipe accidents.

Description

This paper was transferred from the original CD ROM created for this conference. The material was published using Adobe Acrobat 10.1.0 Technology. The original CD ROM was produced by CE Projects cc. Postal Address: PO Box 560 Irene 0062 South Africa. Tel.: +27 12 667 2074 Fax: +27 12 667 2766 E-mail: proceedings@ceprojects.co.za

Keywords

Turbo roundabout, Traffic circle, KwaZulu-Natal (KZN)

Sustainable Development Goals

Citation

Kendal, GR & Reutener, I 2014, "Design and implementation of a turbo roundabout", Paper presented at the 33rd Annual Southern African Transport Conference 7-10 July 2014 "Leading Transport into the Future", CSIR International Convention Centre, Pretoria, South Africa.