Optimising production time of continuous miners at Goedehoop Colliery

Show simple item record

dc.contributor.advisor Breytenbach, Wynand
dc.contributor.author Kraucamp, Yovanka
dc.date.accessioned 2014-02-13T13:06:09Z
dc.date.available 2014-02-13T13:06:09Z
dc.date.created 2014-04-08
dc.date.issued 2014
dc.description Dissertation (B.Eng. (Industrial and Systems Engineering))--University of Pretoria, 2014. en_US
dc.description.abstract Anglo American and the rest of the mining landscape are confronted with a number of challenges such as the depressed economy and the relatively low selling price of coal. These affect profit margins. Anglo American changed its normal way of doing business by the implementation of the Asset Optimisation Programme. Major efforts focus on the optimisation and sustainability of the corporation’s resources, employees and equipment. The Continuous Miner (CM) is the most critical component in the underground coal mining process. An underground production section can only produce output if the CM is performing its primary function, namely to cut coal. In 2012, Goedehoop colliery's CMs operated only 35% of the total time available, and the colliery aims to improve it to 40%. The aim of the project is to improve the production time of the CMs at Goedehoop colliery. The Six Sigma DMAIC (Define, Measure, Analyse, Improve and Control) methodology was used as an approach to structure the project. The aim of the project was addressed by means of critical analysis together with other supplementary tools and techniques. Key Performance Indicators (KPIs) that had the most significant impact on the production time of the CMs were identified. It was identified that trunk conveyor downtime has a significant impact on the throughput of the process, as well as on the production time of the CMs. Solutions were proposed that will potentially improve and solve major causes of trunk conveyor downtime. It was estimated that a total of 162.88 hours (per year) on trunk conveyor downtime can possibly be reduced if the proposed solutions had to be implemented. This would result in a potential benefit of R 8 417 107.29 per year for Goedehoop colliery. In view of the initial project aim, this will equate to a potential 1.5% improvement in the production time of the CMs. en_US
dc.description.availability unrestricted en_US
dc.description.department Industrial and Systems Engineering en_US
dc.identifier.citation Kraucamp, Y 2014, Optimising production time of continuous miners at Goedehoop Colliery, BEng dissertation, University of Pretoria, Pretoria, viewed yymmdd <http://hdl.handle.net/2263/33475>
dc.identifier.uri http://hdl.handle.net/2263/33475
dc.language.iso en en_US
dc.rights © 2014 University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. en_US
dc.subject Optimisation en_US
dc.subject Mining en_US
dc.subject Production time en_US
dc.title Optimising production time of continuous miners at Goedehoop Colliery en_US