Using tools and techniques to optimize the body shop at Nissan, Rosslyn

Show simple item record

dc.contributor.advisor Breytenbach, Wynand
dc.contributor.author Engelbrecht, Lizet
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2013-04-30T13:33:45Z
dc.date.available 2013-04-30T13:33:45Z
dc.date.created 2012
dc.date.issued 2013-04-30
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012. en_US
dc.description.abstract Congestion is a problem not unfamiliar to any manufacturing plant. This is also the case in the Body Shop area for the X90 project at Nissan. Problems that arise from congestion include a longer lead time, safety hazards, over-packing, over manufacturing, frustrated operators and an overall less productive manufacturing line. Many tools and techniques are already in place to address congestion, such as Lean Manufacturing, Methods Engineering, Six Sigma, Kanban pull system, TOC and other industrial engineering concepts. Some of these will be investigated in-depth in this paper’s Literature Review to determine ways to improve on the current manufacturing line in the Nissan Body Shop. To understand the overhead problems, analysis will be done on specific workstations. Journals and research done by peers in the Industrial Engineering field are reviewed to determine the best tools for solving issues highlighted in the Problem Statement. An action plan on how each problem will be addressed is included in the Solutions Methodology chapter of this document. en_US
dc.format.extent 52 pages en_US
dc.format.medium PDF en_US
dc.identifier.uri http://hdl.handle.net/2263/21411
dc.language en
dc.language.iso en en_US
dc.publisher University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.rights Copyright: University of Pretoria en_US
dc.subject Mini-dissertations (Industrial and Systems Engineering) en_US
dc.subject Manufacturing plant en_US
dc.subject Lean manufacturing en_US
dc.title Using tools and techniques to optimize the body shop at Nissan, Rosslyn en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record