A contingency framework of the manufacturing bottleneck of manholes and the improvement of half round channel production

Show simple item record

dc.contributor.advisor Botha, P.J.
dc.contributor.author Van Eck, R.J.
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2012-01-31T11:29:24Z
dc.date.available 2012-01-31T11:29:24Z
dc.date.created 2011
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2011. en_US
dc.description.abstract The evaluation of the post stripping process of the manholes and minimising or eliminating the bottleneck. The improving of production of the half round channel product by looking for alternative methods. en_US
dc.format.extent 32 pages en_US
dc.format.medium PDF en_US
dc.identifier.uri http://hdl.handle.net/2263/17970
dc.language en
dc.language.iso en en_US
dc.publisher University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.rights Copyright: University of Pretoria en_US
dc.subject Mini-dissertations (Industrial and Systems Engineering) en_US
dc.subject Precast concrete en_US
dc.subject Half round channel en_US
dc.subject Production flow en_US
dc.subject Simulation modelling en_US
dc.subject Time study en_US
dc.subject Line balancing en_US
dc.title A contingency framework of the manufacturing bottleneck of manholes and the improvement of half round channel production en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record