Optimizing facility layout through simulation

Show simple item record

dc.contributor.author Kriel, M.
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2010-12-17T06:47:38Z
dc.date.available 2010-12-17T06:47:38Z
dc.date.created 2010-10
dc.date.issued 2010-12-17T06:47:38Z
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2010. en_US
dc.description.abstract Clyde Bergemann Africa would like to make it possible to manufacture specialized equipment used in their pneumatic systems in-house. To accomplish this, a new workshop and its layout have to be designed. The through put time of the production of the vessels will be calculated by doing comprehensive time studies and thus determining the cycle time. By manufacturing the vessels on the premises the company can apply more rigorous quality and job control in terms of the quality of the vessels, controlling the schedule and the cost of the new workshop. This will result in keeping CBZ at the fore front of the field and improving customer satisfaction. The following aspects of designing a new facility were addressed: • Process Flow • Equipment needed • Process Analysis Area requirements Location of the different departments Material Handling Cycle times The techniques learned in facility design, productivity and manufacturing systems were used to assist in solving the problems stated above. en_US
dc.identifier.uri http://hdl.handle.net/2263/15446
dc.language en
dc.language.iso en en_US
dc.rights Copyright: University of Pretoria en_US
dc.subject Facility planning en_US
dc.subject Cycle time determination en_US
dc.subject Manufacturing process en_US
dc.title Optimizing facility layout through simulation en_US
dc.type Text en_US