An optimal maintenance scheduling model for the transmission division of Eskom

Show simple item record

dc.contributor.author Hedges, Joanne Rita
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2010-03-11T11:59:12Z
dc.date.available 2010-03-11T11:59:12Z
dc.date.created 2009-11
dc.date.issued 2010-03-11T11:59:12Z
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2009. en_US
dc.description.abstract With the current demand for greater electricity output, Eskom has had to find ways of improving productivity and efficiency. Consumer demand is only part of the problem as a backlog of maintenance has reduced the electricity output considerably. With switchgear being non-operational, the power stations cannot generate enough electricity to meet demands. The Transmission (TX) divisions’ maintenance team must decide upon the optimal usage of planned outages (maintenance opportunities) at the Hendrina power station, situated in Mpumalanga. The power station is owned by the Generation (GX) division who control the frequency of these planned outages to allow maintenance to occur. TX therefore don’t have the ability to freely conduct maintenance anytime they need to. Occasionally Generations’ equipment will fail and result in unplanned outages which TX may or may not use for maintenance. By developing a Dynamic Programming model to aid TX in decisions concerning circuit breaker maintenance, an optimal maintenance schedule is provided for utilising planned outages as well as suggestions concerning the use of unplanned outages. en_US
dc.identifier.uri http://hdl.handle.net/2263/13430
dc.language en
dc.language.iso en en_US
dc.rights Copyright: University of Pretoria en_US
dc.subject Maintenance scheduling en_US
dc.subject Dynamic programming en_US
dc.subject Circuit breaker maintenance en_US
dc.title An optimal maintenance scheduling model for the transmission division of Eskom en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record