Browsing Mini-dissertations (Industrial and Systems Engineering) by Subject "Scheduling"

Browsing Mini-dissertations (Industrial and Systems Engineering) by Subject "Scheduling"

Sort by: Order: Results:

  • Booyens, M.L.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2010-12-17)
    Operations Management encompasses a wide variety of activities. At Denel Dynamics the most important of these is the Planning Phase which directs the flow of production and is thus critical to the success of the company. The ...
  • Cloete, Ulindi; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2012)
    The project on sequential building to ensure sequential delivery will be done at the Rosslyn Plant Nissan SA (NSA). A production line on building vehicles needs to incorporate or make use of sequential building to achieve ...
  • Du Plessis, L.J. (Louw J.); University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2011-03-31)
    South Africa is faced with a major problem regarding power supply and consumption. Companies throughout South Africa do not practice efficient energy usage although we are a country that suffers from major power outages ...
  • Thorburn, Antoinette; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, November 2)
    Spring Valley Foods is a supplier of fresh whole and produced fruit. It is a constant battle to ensure just enough workers for the day’s work. Labour cost can be one of the highest costs a company can incur, and has a ...
  • Agas, Marco Edward (2014)
    A large retailer has established that its vendor truck’s turnaround time within its distribution centre is not entirely satisfactory. The retailer aims to decrease this turnaround time in a way that would provide the ...
  • Du Plessis, Louis Philip; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2012)
    Every Virgin Active health club has several independent instructors that teach group exercise classes at the facility. The current method of communicating with staff is very archaic and can be greatly improved upon. Not ...
  • Van Buisbergen, Marilize; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2012)
    This project aims to change the way ChessCube manages its moderators by introducing Operations Research related concepts to the moderator management process to improve the coverage provided by existing moderators, as well ...