De Clercq, F.J.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
(2009-07-20)
This project will focus on designing maintenance and optimal replacement schedules for the sub-assemblies (subs) of the Continuous Miners (CM). The current method of determining when sub failures will occur is done on ...