Browsing Mini-dissertations (Industrial and Systems Engineering) by Subject "Facilities planning"

Browsing Mini-dissertations (Industrial and Systems Engineering) by Subject "Facilities planning"

Sort by: Order: Results:

  • Oberholzer, Marietjie; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2013-04-29)
    The content of this report is centred upon Apex Valves (Pty) Ltd situated in Centurion, South Africa. Apex Valves is a supplier of plumbing and geyser valves. Their operations take place within four connected factory units ...
  • Masombuka, Willy Sizo; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    A design of an improved facilities plan for Components Paint Shop, with appropriate and efficient material flow and handling system. The facility should optimise production efficiency throughout Components Paint Shop.
  • Gray, Matt; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The project proposal aims to provide an overview of the tasks to be completed and methods to be used in solving the problem of designing a clothing and novelties warehouse. It also provides a literature review discussing ...
  • Agra, R.S.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    Developing an operations plan for the dispatching area. C-Ident storage should also be allocated in this area. All processes are moved to different location.
  • Van der Sandt, Theresa; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The depot design developed for the project, meets all the criteria identified by TrenStar and Ford Motor Company. The current design can handle the volumes of reusable packaging, has the identified areas required to perform ...
  • De la Pierre, J.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2010-01-28)
    Competing in the computer hardware industry can be a challenge under the best of circumstances, seeing how today’s futuristic technology, will be tomorrows junk. Competing in the industry forces companies to ensure that ...
  • Biddulph, R.C.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2011-04-01)
    Due to the high rate of failures and damages occurring with current traffic light assemblies because of motorists striking them or the nature of the components, there is a need for optimizing the production rate. This need ...
  • Muntz, Jonathan; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2013-04-29)
    BedRock Mining Support (Pty) Ltd is a fully integrated timber-based mine support company that supplies timber support to the gold and platinum mines. BedRock runs a J.I.T process and therefore has a challenge to consistently ...
  • Serote, L.M.B.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2011-05-11)
    The high pressure of the aggressively competitive modern market prompts many a company to embark on a process of continuous improvement. The survival of companies hinges on their ability to not only adapt to changes but ...
  • Holman, Alistair; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The goal of this project is to design a new tobacco sales floor for Tribac (Pvt.) Ltd. This project utilizes common facilities planning principles together with time studies, line balancing calculations, statistical control ...
  • Kasselman, Geani; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The operations within the slab yard of EHSV were improved using best practices. Inventory control is improved with better obsolete stock handling and an improved layout and locator system.
  • Mtshali, Sibongakonke G.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering; Momsen, Sune (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    This project aims to improve productivity, reduce the amount of scrap generated and the processing time by applying lean manufacturing techniques.
  • Dakers, Monique; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The problem at hand is that the lease of the Beetex factory is an unnecessary expense for the company in terms of rent, water and electricity. The capacity of the space rented is not fully utilized, whilst capacity in the ...
  • Zietsman, J.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2013-04-30)
    Industrial Engineering knowledge can be applied to businesses that operate ineffectively in order to save time, money, space, energy and other resources. The knowledge gained during the study of Facility Planning Layout ...
  • Schoeman, Ettienne; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2012)
    This report consists of a thorough literature review conducted on the topic of this project. It also contains the planning procedures taken in preparation of this project to enable Modelpak to bring their old, unkempt ...
  • Kraaij, Gustav; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (2011-04-08)
    Oasis water was established 7 years ago, in the last three years the company grew so much that they now have more than 100 outlets nationwide. Each outlet provides customers with bottled filtrated water of sizes from 300ml ...
  • Janse van Rensburg, T.J.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, 2011)
    The aim of this project is to analyse and improve the warehouse operations and management of Tribeca and to evaluate and select alternative strategies to address their current operational issues.
  • Swart, Alexander Daniel; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    The Rosslyn parts warehouse is Nissan’s sole supplier of parts to all dealers throughout South Africa and sub-Sahara Africa. Management is currently concerned about the effectiveness of the warehouse operation, demanding ...
  • Fourie, Charl; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    Each distribution network has a few common problems, but truckload utilisation has proven to be one area, that deserves more consideration that it is currently receiving. Truckload utilisation can have a considerable ...
  • Fouche, C.A.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering (University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering, )
    The Power Electronics Department of Transnet Rail Engineering has the opportunity to relocate to a new facility due the certain problems that they are facing. A layout for the new facility has to be designed to be the ...