Photo of Model [1:25] of the Desmond and Leah Tutu Bridge, linking St Johns College and Roedean School, Houghton Drive, Johannesburg, built by 3rd year B.Sc. (Arch) students, University of Pretoria, 2006.
Mbogela, Ayoub Julius(University of Pretoria, 2021)
The modular multilevel active rectifier was designed and evaluated, whereby the half bridge and the full bridge DC-DC converters as its submodules for the high voltage direct current transmission were compared. It was found ...
Jones, D.; Southern African Transport Conference (21st : 2002 : Pretoria, South Africa)(SATC, 2002-07)
Paper presented at the 21st Annual South African Transport Conference 15 - 18 July 2002 "Towards building capacity and accelerating delivery", CSIR International Convention Centre, Pretoria, South Africa.
Botes, F.J.; Serero, G.(Southern African Transport Conference, 2015)
Decisions about border post location and design are often based on operational, design and implementation cost considerations, without due consideration of the economic impact of these choices. Although the resultant changes ...