Developing a mining plan for restarting the operation at Uis mine

Show simple item record

dc.contributor.author Maritz, J.H. (Henko)
dc.contributor.author Uludag, S.
dc.date.accessioned 2021-02-02T08:21:45Z
dc.date.available 2021-02-02T08:21:45Z
dc.date.issued 2019-07
dc.description Paper written on project work carried out in partial fulfilment of B.Eng (Mining Engineering) degree. en_ZA
dc.description.abstract AfriTin Mining Limited plans to reopen the Uis tin mine in Namibia and establish a pilot processing plant for phase 1 of the Uis tin project, which is scheduled to commence in the last quarter of 2018 . A mining plan is required for phase 1 to supply the new pilot processing plant with 500 kt of run-of-mine ore per annum, for a period of 5 years. New geological mapping and three-dimensional modelling of the mining area were utilized to identify the most optimal mining locations that require low initial waste stripping. An open-pit mining method was selected to target the surface outcrops of the pegmatite orebodies. The mine design criteria were determined and used as input to generate the mine design by utilizing professional engineering software. The mine design was optimized and an overall stripping ratio of 0.81 was achieved. A 5-year production schedule was developed for the mine design according to quarterly periods of three months. A fixed production target of 125 kt of ore was assigned to the quarterly periods, and a ramp-up production target of 65 kt of ore was assigned for the first period. The mobile mining equipment requirements were calculated, and recommendations were made for implementing the 5-year mining plan. en_ZA
dc.description.department Mining Engineering en_ZA
dc.description.librarian am2020 en_ZA
dc.description.uri http://www.saimm.co.za/journal-papers en_ZA
dc.identifier.citation Maritz, J.H. and Uludag, S. 2020, 'Developing a mining plan for restarting the operation at Uis mine', Journal of the Southern African Institute of Mining and Metallurgy, vol. 119, no. 7, pp. 621-630, DOI : 10.17159/2411-717/536/2019. en_ZA
dc.identifier.issn 0038-223X (print)
dc.identifier.issn 2225-6253 (online)
dc.identifier.other 10.17159/2411-717/536/2019
dc.identifier.uri http://hdl.handle.net/2263/78188
dc.language.iso en en_ZA
dc.publisher Southern African Institute of Mining and Metallurgy en_ZA
dc.rights © The Southern African Institute of Mining and Metallurgy, 2019 en_ZA
dc.subject Mining plan en_ZA
dc.subject Mine design criteria en_ZA
dc.subject Production schedule en_ZA
dc.subject Optimal en_ZA
dc.subject Stripping ratio en_ZA
dc.title Developing a mining plan for restarting the operation at Uis mine en_ZA
dc.type Article en_ZA