Design and construction risks for a shipping port and container terminal : case study

Show simple item record

dc.contributor.author Joubert, Francois Jacobus
dc.contributor.author Pretorius, Leon
dc.date.accessioned 2020-03-26T11:27:03Z
dc.date.available 2020-03-26T11:27:03Z
dc.date.issued 2020-01
dc.description.abstract This paper presents the risk identification process, a checklist of 215 different risks, and an associated risk breakdown structure (RBS) for the design and construction phases for a shipping port and associated container terminal. The case study project scope for the research includes a 3,500-m breakwater, 80 ha of reclaimed land, a 1,000-m-long quay wall, port equipment, and buildings. The checklist is categorized according to the project work breakdown structure (WBS) and includes risks associated with (1) breakwater, (2) reclaimed land, (3) entrance canal and basin, (4) quay wall, (5) container yard and buildings, (6) power supply, and (7) project management office. Since the research outcome was developed by subject matter experts during an actual project, it can be used during risk identification, as a completeness check after risk identification on similar projects, or for individual activities (e.g., quay wall construction) per the required project scope. The research also includes a list of risks that specifically relate to marine construction. en_ZA
dc.description.department Graduate School of Technology Management (GSTM) en_ZA
dc.description.librarian hj2020 en_ZA
dc.description.uri https://ascelibrary.org/journal/jwped5 en_ZA
dc.identifier.citation Joubert, F.J. & Pretorius, L. 2020, 'Design and construction risks for a shipping port and container terminal: case study', Journal of Waterway, Port, Coastal, and Ocean Engineering, vol. 146, no. 1, art. 05019003, pp. 1-13. en_ZA
dc.identifier.issn 0733-950X (print)
dc.identifier.issn 1943-5460 (online)
dc.identifier.other 10.1061/(ASCE)WW.1943-5460.0000537
dc.identifier.uri http://hdl.handle.net/2263/73838
dc.language.iso en en_ZA
dc.publisher American Society of Civil Engineers en_ZA
dc.rights © ASCE. This work is made available under the terms of the Creative Commons Attribution 4.0 International license, http://creativecommons.org/licenses/by/4.0/. en_ZA
dc.subject Port construction en_ZA
dc.subject Container terminal en_ZA
dc.subject Project risk management en_ZA
dc.subject Risk identification en_ZA
dc.subject Checklist en_ZA
dc.subject Risk breakdown structure (RBS) en_ZA
dc.subject Wisk breakdown structure (RBS) en_ZA
dc.subject Container shipping en_ZA
dc.subject Ports and harbors en_ZA
dc.subject Breakwaters en_ZA
dc.subject Case studies en_ZA
dc.subject Project management en_ZA
dc.subject Walls en_ZA
dc.subject Construction management en_ZA
dc.title Design and construction risks for a shipping port and container terminal : case study en_ZA
dc.type Article en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record