The influence of bench height and equipment selection on effective mineral resource utilization

Show simple item record

dc.contributor.advisor Thompson, Roger John en
dc.contributor.postgraduate Swanepoel, Werner en
dc.date.accessioned 2013-09-06T15:27:36Z
dc.date.available 2004-03-31 en
dc.date.available 2013-09-06T15:27:36Z
dc.date.created 2003-12-05 en
dc.date.issued 2005-03-31 en
dc.date.submitted 2004-03-26 en
dc.description Dissertation (MEng (Mining Engineering))--University of Pretoria, 2005. en
dc.description.abstract The mine planning process converts resources into economically mineable reserves, focusing on value addition and risk reduction. Equipment selection is traditionally addressed late in the process and addresses production capacity, equipment matching and equipment allocation. The primary focus being to reduce the operating cost per unit of material handled. Mineral resource management is an integration of the key functions in the mining process. A focus on resource utilisation plays a key role in the management process and leads to the question whether lower operating costs always add value in the long term. It was determined that traditional equipment selection methods are not effective for all mineral deposits and might even be short sighted, destroying value over the long term. The mine planning process was adapted to allow for an early investigation into the potential for increased recovery. The effect of selectivity in the loading action is simulated in a 3D environment over a range of bench heights. The results are analysed with a grade tonnage curve and the saleable product at each bench height is calculated, taking account of the required product qualities. The concept of financial materiality is applied to classify the resource as either a massive or selective deposit. A massive deposit support the traditional drive for bigger equipment and will benefit from lower operating costs. A selective deposit requires less focus on production capacity, equipment matching and allocation and more on resource recovery. In order to take advantage of the potential indicated in the evaluation, it is necessary to modify the traditional equipment selection techniques. A thorough understanding of the capabilities of the loading equipment is required in an attempt to match these abilities with the geometry of the ore deposit. The objective is to identify the equipment that will ensure the highest mining recovery at the lowest cost. This will be achieved when the loading equipment can attain a mining recovery smaller than the bench height it is mining or if the equipment can be applied economically on small bench heights. The most suitable equipment can only be determined at the hand of a total value chain costing analyses. This means that the production cost i.e. the cost to produce the final product must be evaluated and not the operating cost i.e. the cost to move a unit of material, as is often the case. The proposed mine planning approach and equipment selection technique was used on the Thabazimbi iron ore mine deposits. The results indicated that the NPV of the project could be increased dramatically. It was concluded that the ability to load selectively cannot be calculated mathematically. It is a judgment made on a thorough evaluation of the design and operating features of the shovel in conjunction with the ore body geometric parameters and the loading face conditions. The efficiency of the selected shovel can be manipulated through the application of different bench heights, and the optimum combination can only be determined through a total value chain costing analyses. en
dc.description.availability unrestricted en
dc.description.department Mining Engineering en
dc.identifier.citation Swanepoel, W 2003, The influence of bench height and equipment selection on effective mineral resource utilization, MEng dissertation, University of Pretoria, Pretoria, viewed yymmdd < http://hdl.handle.net/2263/23494 > en
dc.identifier.upetdurl http://upetd.up.ac.za/thesis/available/etd-03262004-153027/ en
dc.identifier.uri http://hdl.handle.net/2263/23494
dc.language.iso en
dc.publisher University of Pretoria en_ZA
dc.rights © 2003, University of Pretoria. All rights reserved. The copyright in this work vests in the University of Pretoria. No part of this work may be reproduced or transmitted in any form or by any means, without the prior written permission of the University of Pretoria. en
dc.subject Equipment selection en
dc.subject Mineral resource utilization en
dc.subject Bench height en
dc.subject UCTD en_US
dc.title The influence of bench height and equipment selection on effective mineral resource utilization en
dc.type Dissertation en


Files in this item

This item appears in the following Collection(s)

Show simple item record