Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time

Show simple item record

dc.contributor.author Grobler, Jacomine
dc.contributor.author Engelbrecht, Andries P.
dc.contributor.author Kok, Schalk
dc.contributor.author Yadavalli, Venkata S. Sarma
dc.date.accessioned 2010-03-24T06:21:48Z
dc.date.available 2010-03-24T06:21:48Z
dc.date.issued 2009-01
dc.description.abstract This paper investigates the application of particle swarm optimization (PSO) to the multi-objective flexible job shop scheduling problem with sequence-dependent set-up times, auxiliary resources and machine down time. To achieve this goal, alternative particle representations and problem mapping mechanisms were implemented within the PSO paradigm. This resulted in the development of four PSO-based heuristics. Benchmarking on real customer data indicated that using the priority-based representation resulted in a significant performance improvement over the existing rule-based algorithms commonly used to solve this problem. Additional investigation into algorithm scalability led to the development of a priority-based differential evolution algorithm. Apart from the academic significance of the paper, the benefit of an improved production schedule can be generalized to include cost reduction, customer satisfaction, improved profitability, and overall competitive advantage. en
dc.identifier.citation Grobler, J, Engelbrecht, AP, Kok, S & Yadavalli, S 2009, 'Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time', Annals of Operations Research, doi:10.1007/s10479-008-0501-4. [http://www.springerlink.com/content/101740/] en
dc.identifier.issn 0254-5330
dc.identifier.other 10.1007/s10479-008-0501-4
dc.identifier.uri http://hdl.handle.net/2263/13693
dc.language.iso en en
dc.publisher Springer en
dc.rights Springer en
dc.subject Particle swarm optimization (PSO) en
dc.subject Differential evolution en
dc.subject Flexible job shop scheduling en
dc.subject.lcsh Production scheduling en
dc.title Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time en
dc.type Postprint Article en