Coetzee, R.; University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
(2011-05-11)
A Production flow line at 3M was investigated to find the cause for the inefficient flow line. The demand of the products is not met on time, making this area a consistent problem for many grounds. 3M’s unit cost is ...