Buffer sizing for the critical chain project management method

Show simple item record

dc.contributor.author Geekie, Adrian
dc.contributor.author Steyn, Herman
dc.date.accessioned 2008-07-16T07:14:00Z
dc.date.available 2008-07-16T07:14:00Z
dc.date.issued 2008-05
dc.description.abstract Methods for sizing project and feeding buffers for critical chain project management are investigated. Experiments indicate that – in the absence of bias, and for certain classes of bias – buffer consumption is independent of the mean duration of a chain. Generally the popular method – a buffer size equal to 50% of the longest path leading to it – gives rise to excessively large buffers. Buffers sized according to the square root of the sum of squares perform well in the absence of bias, but with bias present the performance is unacceptably poor. A new approach to buffer sizing is proposed. en
dc.description.abstract Metodes vir groottebepaling van projek- en saamvloeibuffers vir kritieke-ketting projekbestuur word ondersoek. Eksperimente dui daarop dat – in die afwesigheid van onewewigtigheid, en vir sekere tipes onewewigtigheid – bufferverbruik onafhanklik is van die gemiddelde lengte van ’n ketting. Oor die algemeen veroorsaak die metode van buffergrootte – gelyk aan 50% van die langste pad wat tot die buffer lei – onnodige groot buffers. Buffers bepaal met die metode van die vierkantswortel van die som van kwadrate, vaar goed in die afwesigheid van onewewigtigheid, maar vaar onaanvaarbaar swak wanneer onewewigtigheid teenwoordig is. ’n Nuwe metode vir die bepaling van buffergrootte word voorgestel.
dc.format.extent 397997 bytes
dc.format.extent 249876 bytes
dc.format.mimetype application/pdf
dc.identifier.citation Geekie, A & Steyn, H 2008, ‘Buffer sizing for the critical chain project management method', South African Journal of Industrial Engineering, vol.19, no.1, pp. 73-88. [http://www.journals.co.za/ej/ejour_indeng.html] en
dc.identifier.issn 1012-277X
dc.identifier.uri http://hdl.handle.net/2263/6163
dc.language.iso en en
dc.publisher Southern African Institute for Industrial Engineering en
dc.rights Southern African Institute for Industrial Engineering en
dc.subject Critical chain project management en
dc.subject.lcsh Project management
dc.subject.lcsh Production scheduling
dc.title Buffer sizing for the critical chain project management method en
dc.type Article en


Files in this item

This item appears in the following Collection(s)

Show simple item record