An optimal investment planning framework for multiple distributed generation units in industrial distribution systems

Show simple item record

dc.contributor.author Hung, Duong Quoc
dc.contributor.author Mithulananthan, N.
dc.contributor.author Bansal, Ramesh C.
dc.date.accessioned 2015-11-09T07:44:41Z
dc.date.available 2015-11-09T07:44:41Z
dc.date.issued 2014-07
dc.description.abstract This paper presents new analytical expressions to efficiently capture the optimal power factor of each Distributed Generation (DG) unit for reducing energy losses and enhancing voltage stability over a given planning horizon. These expressions are based on the derivation of a multi-objective index (IMO), which is formulated as a combination of active and reactive power loss indices. The decision for the optimal location, size and number of DG units is then obtained through a benefit–cost analysis. Here, the total benefit includes energy sales and additional benefits, namely energy loss reduction, network upgrade deferral and emission reduction. The total cost is a sum of capital, operation and maintenance costs. The methodology was applied to a 69-bus industrial distribution system. The results showed that the additional benefits are imperative. Inclusion of these in the analysis would yield faster DG investment recovery. en_ZA
dc.description.librarian hb2015 en_ZA
dc.description.uri http://www.elsevier.com/locate/apenergy en_ZA
dc.identifier.citation Hung, DQ, Mithulananthan, N & Bansal, RC 2014, 'An optimal investment planning framework for multiple distributed generation units in industrial distribution systems', Applied Energy, vol. 124, pp. 62-72. en_ZA
dc.identifier.issn 0306-2619 (print)
dc.identifier.issn 1872-9118 (online)
dc.identifier.other 10.1016/j.apenergy.2014.03.005
dc.identifier.uri http://hdl.handle.net/2263/50383
dc.language.iso en en_ZA
dc.publisher Elsevier en_ZA
dc.rights © 2014 Elsevier Ltd. All rights reserved. Notice : this is the author’s version of a work that was accepted for publication in Applied Energy. Changes resulting from the publishing process, such as peer review, editing, corrections, structural formatting, and other quality control mechanisms may not be reflected in this document. Changes may have been made to this work since it was submitted for publication. A definitive version was subsequently published in Applied Energy, vol. 124, pp. 62-72, 2014. doi : 10.1016/j.apenergy.2014.03.005. en_ZA
dc.subject Distributed generation en_ZA
dc.subject Emission reduction en_ZA
dc.subject Loss reduction en_ZA
dc.subject Network upgrade deferral en_ZA
dc.subject Optimal power factor en_ZA
dc.subject Voltage stability en_ZA
dc.title An optimal investment planning framework for multiple distributed generation units in industrial distribution systems en_ZA
dc.type Postprint Article en_ZA


Files in this item

This item appears in the following Collection(s)

Show simple item record