Mining through areas affected by abnormal stress conditions at Syferfontein Colliery

Show simple item record

dc.contributor.author Legote, C.
dc.date.accessioned 2015-09-30T06:31:52Z
dc.date.available 2015-09-30T06:31:52Z
dc.date.issued 2015-04
dc.description Paper written as project work carried out in partial fulfilment for BEng (Mining Engineering) degree. en_ZA
dc.description.abstract This paper investigates the conditions leading to the indefinite termination of production in four critical primary panels at an underground coal mining operation, the observed shortcomings in the mining approach, and the proposed strategy to mine through the affected panels. Initial assessment of the abandoned panel conditions indicated time-dependent strata failure, (i.e. bolted roof failure overrunning intersections), which occurred from mere minutes to up to four weeks post-production, with and without prior warning of failure. This prompted the constant re-supporting of back areas, which raised safety and productivity concerns. Investigation of the initial mining conditions revealed that the failures were due to a critical combination of factors, the chief of which was isolated horizontal stress. Other factors that were initially overlooked by the mine (i.e. influence of hydraulic stress, misinterpretation of borehole data), resulted in the conditions being described as abnormal. Remedial actions were determined, and in so doing, a new strategic approach was formulated to thoroughly address all failure concerns. The four panels were explicitly planned to serve as the main intake and return airways for the recently commissioned secondary ventilation shaft, as well as providing access to millions of tons in proven coal reserves. It is thus imperative to mine the panels. A feasibility study showed that the proposed strategy set for implementation would be financially viable. en_ZA
dc.description.librarian am2015 en_ZA
dc.description.uri http://www.saimm.co.za/journal-papers en_ZA
dc.identifier.citation Legote, C 2015, 'Mining through areas affected by abnormal stress conditions at Syferfontein Colliery', Journal of the Southern African Institute of Mining and Metallurgy, vol. 115, pp. 265-269. en_ZA
dc.identifier.issn 0038-223X (print)
dc.identifier.issn 2225-6253 (online)
dc.identifier.uri http://hdl.handle.net/2263/50102
dc.language.iso en en_ZA
dc.publisher Southern African Institute of Mining and Metallurgy en_ZA
dc.rights © The Southern African Institute of Mining and Metallurgy, 2015 en_ZA
dc.subject Critical primary panels en_ZA
dc.subject Time-dependent strata failure en_ZA
dc.subject Horizontal stress en_ZA
dc.subject Proven reserves en_ZA
dc.subject Termination of production en_ZA
dc.title Mining through areas affected by abnormal stress conditions at Syferfontein Colliery en_ZA
dc.type Article en_ZA