Creating a priority based pull system within pre-packing area for Cosira Group, Vulcania

Show simple item record

dc.contributor.author Mahne, J.
dc.contributor.other University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.date.accessioned 2013-02-19T06:19:20Z
dc.date.available 2013-02-19T06:19:20Z
dc.date.issued 2012
dc.description Thesis (B Eng. (Industrial and Systems Engineering))--University of Pretoria, 2012. en_US
dc.description.abstract This document provides the reader with insight into the project at Cosira Group, Vulcania, Springs. The document includes the path of the student, as well as the proposed solutions that will potentially be followed in order to successfully complete the project. The aim of the project is for the student to showcase his competency in the relevant areas. This is done so that the University may award the student a BEng Industrial degree. Included in this paper is research that was done by the student regarding similar cases and problems in industry. The methods, tools, techniques, successes and failures from different projects were investigated. This was done to increase the understanding and insight into the problems that the student will face. Relevant techniques that will be used as well as methodologies that will be followed are discussed. Research was done at Cosira and the data was analysed in such a way as to complement the aim of the project. After the solutions or proposed systems are potentially implemented, there will be estimated cost savings as well as improved customer satisfaction. The work in progress (WIP) will be less and the time an order spends in the entire facility should be less. This project will showcase the ability of the student to analyze a problem as well as prove the legitimacy and motivation for the completion of a project using industrial engineering tools and thinking. en_US
dc.format.extent 38 pages en_US
dc.format.medium PDF en_US
dc.identifier.uri http://hdl.handle.net/2263/21083
dc.language en
dc.language.iso en en_US
dc.publisher University of Pretoria. Faculty of Engineering, Built Environment and Information Technology. Dept. of Industrial and Systems Engineering
dc.rights Copyright: University of Pretoria en_US
dc.subject Mini-dissertations (Industrial and Systems Engineering) en_US
dc.subject Pull System en_US
dc.subject Lean manufacturing en_US
dc.subject Six Sigma en_US
dc.subject Value-Stream Mapping en_US
dc.title Creating a priority based pull system within pre-packing area for Cosira Group, Vulcania en_US
dc.type Text en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record